Concrete Structures & Floors (Concrete SF) continues to demonstrate industry-leading capability in delivering fast, reliable structural systems for commercial, industrial, and specialised construction environments across the United Kingdom. Recent projects in Avonmouth and Southend-on-Sea highlight how Concrete SF consistently delivers high-quality outcomes on accelerated programmes with precision, coordination, and full compliance with client expectations.
From delivering a complete composite flooring solution under a demanding timeline at an industrial site, to executing a same-day steel roof decking and safety netting installation for a hospital environment, these case studies show Concrete SF’s depth of experience, specialist expertise, and ability to support complex builds with measurable on-site performance.
Industrial construction environments demand both structural resilience and programme certainty. At the Avonmouth site, Concrete SF was commissioned to deliver an accelerated flooring installation that combined steel composite decking with reinforced concrete works.
Key features of this project included:
The balanced use of CMF MetFloor 60 provided excellent span capability and concrete economy, ensuring a durable, load-bearing floor suitable for waste management operations.
Concrete SF’s integrated supply and install model enabled seamless coordination across design finalisation, material logistics, and on-site execution. This ensured:
The result was a high-quality industrial floor delivered within programme without compromise — an outcome that underscores Concrete SF’s ability to deliver complex structural systems under strict timeframes.

Healthcare environments require stringent standards of coordination, safety, and efficiency. For the Spire Wellesley Hospital project, Concrete SF’s operations took place in a tightly controlled site environment with excellent on-site management by Roskerry and preparation by Fullpen Fabrications.
This allowed Concrete SF to execute the full scope — safety netting and steel decking installation — in a single working day.
With zero other trades in the working area and all preparatory access and infrastructure in place, Concrete SF’s team focused on efficient installation supported by:
This project further emphasised Concrete SF’s ability to operate in specialised environments, delivering structural components with precision and client satisfaction.
Across both Avonmouth and Spire Wellesley Hospital case studies, Concrete SF continues to show:
Whether a 14-day industrial floor or a same-day healthcare roof decking installation, Concrete SF’s planning and delivery model supports fast-paced programmes without compromising quality or safety.
From composite steel decking systems like CMF MetFloor 60 to specialist roof profiles like TATA RoofDek D100, Concrete SF provides complete structural delivery — from supply through to high-quality installation.
Both projects delivered measurable outcomes through high standards of site coordination, safety planning, and collaboration with main contractors and fabrication partners.
Concrete SF’s work spans industrial, commercial, and specialised sectors such as healthcare, demonstrating adaptability and deep domain expertise.

Concrete Structures & Floors distinguishes itself through:
The Avonmouth and Spire Wellesley Hospital projects are clear examples of Concrete SF’s commitment to excellence in structural works. From delivering engineered composite flooring systems to executing rapid schedule roof decking installations, Concrete SF combines technical proficiency, strategic planning, and disciplined execution — providing clients across the UK with dependable outcomes on complex construction programmes.
For enquiries, project support, or to speak with a Concrete SF specialist about your upcoming structural flooring or decking requirement:
Find more posts like this from the CSF team.